How much runway does a private jet need?
By Jake Lombardi. Published . 6 min read.

The short answer
It depends on the jet and the rules it flies under. Embraer lists 3,209 feet to take off and 2,212 feet to land for a Phenom 300E at sea level. Where 14 CFR 135.385 applies to a charter, the landing must fit within 60 percent of the runway, so a 2,212-foot landing needs about 3,687 feet, and 115 percent of that, about 4,240 feet, if the runway may be wet.
On this page
- The short version
- What runway length does a private jet need?
- What is the 60 percent rule for charter flights?
- Which aircraft does the 60 percent rule apply to?
- How much more runway does a wet runway need?
- Can some charter operators use a shorter runway?
- Why can a privately owned jet use a runway a charter cannot?
- Which runways near New York are short enough to matter?
- How Jake works
- Sources
- More questions people ask
- Sources
A private jet needs more runway than its brochure says, because charter rules add a margin to the landing. Embraer lists 3,209 feet for a Phenom 300E to take off and 2,212 feet to land; where 14 CFR 135.385 applies, that landing needs about 3,687 feet of runway, and about 4,240 feet if the runway may be wet.
This page sets out the published distances, the federal rules that turn them into a required runway length, and what that means for short runways people fly to from New York. Lombardi Jet Services is a broker; it arranges charters on aircraft operated by Part 135 certificate holders, whose crews make the runway decision for each flight.
The short version
- The brochure figure is the start, not the answer. Embraer’s Phenom 300E figures are 3,209 feet to take off at maximum weight and 2,212 feet to land, both at sea level on a standard day.
- Charter landings must fit in 60 percent of the runway. 14 CFR 135.385(b) sets that test for large transport category turbine airplanes, and 135.397 and 135.398 extend it to small transport and commuter category airplanes.
- A wet runway needs 15 percent more. Under 135.385(d), if the destination may be wet or slippery, the runway must be at least 115 percent of the length the 60 percent test requires.
- Some operators may use 80 percent. An “eligible on-demand operator” with a Destination Airport Analysis and FAA authorization may land within 80 percent of the runway under 135.385(f).
- A privately owned jet is not bound by 135.385. That is why an owner may use a runway that a charter operator declines for the same aircraft.
What runway length does a private jet need?
For the jets we checked, between about 3,100 and 3,600 feet to take off at the manufacturer’s stated conditions, and less to land before any charter margin is applied. The table below gives the published figures and what the charter rules make of them.
Manufacturers state their figures at maximum weight, sea level and a standard day, with a dry runway. Embraer’s Phenom 300E landing figure is labelled “Unfactored, 5 occupants, SL, ISA”, which means no regulatory margin has been added. Cessna’s Citation Latitude page lists a takeoff field length of 3,580 feet and a landing distance of 2,480 feet, without stating the conditions. Pilatus lists a takeoff distance of 940 meters, about 3,084 feet, for the PC-24, also without conditions.
Your quote names the aircraft, and its flight manual, not the brochure, is what the crew uses. The manual figure changes with weight, airport elevation, temperature and wind.
What is the 60 percent rule for charter flights?
It is the rule that a charter jet must be able to stop within 60 percent of the destination runway. 14 CFR 135.385(b) says no person may take off unless the airplane’s weight on arrival “would allow a full stop landing at the intended destination airport within 60 percent of the effective length of each runway described below from a point 50 feet above the intersection of the obstruction clearance plane and the runway.”
Two things about that sentence are worth stopping on. The test is applied before takeoff, on the weight the aircraft will have when it arrives. And it uses the “effective length”, measured from the point where obstacles off the end allow the aircraft to be 50 feet up, which can be shorter than the painted runway.
Put the other way round, the runway must be at least 1.67 times the landing distance. For the Phenom 300E’s 2,212-foot landing figure, that is about 3,687 feet of runway, on our arithmetic.
Which aircraft does the 60 percent rule apply to?
By name, to turbine-powered large transport category airplanes, and by extension to small transport and commuter category airplanes. A large aircraft is one of “more than 12,500 pounds, maximum certificated takeoff weight”, under 14 CFR 1.1.
Two further sections carry the rule to smaller types. 14 CFR 135.397(b) requires small transport category turbine airplanes to meet “the landing limitations in §§ 135.385 and 135.387”. 14 CFR 135.398(c) does the same for commuter category airplanes, “notwithstanding their stated applicability to turbine-engine-powered large transport category airplanes.”
We did not find a section in Part 135 that applies the 60 percent test by name to a small jet certificated in the normal category. Which category a given jet is certificated in is on its FAA type certificate, and the margin its operator applies is in the operator’s manual. Ask the operator; Jake does, for any short runway.
How much more runway does a wet runway need?
Fifteen percent more than the dry requirement, for a turbojet. 14 CFR 135.385(d) bars a takeoff “when the appropriate weather reports or forecasts, or any combination of them, indicate that the runways at the destination airport may be wet or slippery at the estimated time of arrival unless the effective runway length at the destination airport is at least 115 percent of the runway length required under paragraph (b)”.
The exception is a shorter wet distance approved for the specific type in its flight manual, “but never less than that required by paragraph (b)”. For a 2,212-foot landing figure, 115 percent of 3,687 feet is about 4,240 feet, on our arithmetic. A forecast of rain at the destination can therefore change the airport, or the aircraft, on the day.
Can some charter operators use a shorter runway?
Yes, an “eligible on-demand operator” may land within 80 percent of the runway instead of 60. Under 14 CFR 135.385(f), the operation must be “permitted by an approved Destination Airport Analysis in that person’s operations manual”, the landing must fit within 80 percent of the effective length, and it must be “authorized by operations specifications.”
14 CFR 135.4 sets out who qualifies: a two-pilot crew, a captain with at least 1,500 hours and, on multi-engine turbine aircraft, an airline transport pilot certificate and type rating, and a second in command with at least 500 hours. At 80 percent, a 2,212-foot landing needs about 2,765 feet. Whether an operator holds this authority for a given airport is a question to ask before booking a short runway.
Why can a privately owned jet use a runway a charter cannot?
Because 135.385 applies to operations under Part 135, and a private owner flying under Part 91 is not under Part 135. The owner’s crew must still land within the flight manual’s figures. In the Part 91 sections we read, we found no percentage margin for an ordinary private flight.
Fractional ownership programs are a middle case: 14 CFR 91.1037 applies a 60 percent landing test to fractional program flights, with an 80 percent option under a Destination Airport Analysis and a 115 percent wet rule. The difference between the three is set out in our page on Part 91 and Part 135.
Which runways near New York are short enough to matter?
Martha’s Vineyard’s crosswind runway is the clearest example. FAA airport data lists runway 15/33 at Martha’s Vineyard at 3,327 feet and runway 6/24 at 5,504 feet; at Nantucket, runway 15/33 is 4,500 feet and runway 6/24 is 6,303 feet.
Against the Phenom 300E’s figure with the 60 percent rule applied, about 3,687 feet, the 3,327-foot runway is too short and the 4,500-foot runway is long enough, dry or wet. The rule also asks which runway the wind will make the crew use, so a short crosswind runway can decide the day even when the main runway is fine. Teterboro’s runways, 6,997 and 6,014 feet, and Aspen’s 8,006-foot runway are long enough by length alone; Aspen’s limits are its altitude, its curfew and its 2027 closure, set out on the Teterboro to Aspen page. Telluride’s 7,111-foot runway sits at 9,070 feet, high enough that whether a private jet can land at Telluride turns on performance, not length.
For the islands, see Teterboro to Martha’s Vineyard and Teterboro to Nantucket.
How Jake works
Jake names the operator and the aircraft in every quote, so the runway question is answered for a specific type. For any destination with a short or single runway, he asks the operator whether the aircraft meets the landing rules it flies under, dry and wet, and what the plan is if rain is forecast. He uses operators rated ARGUS Gold or Platinum, confirmed before quoting, and checks the operator’s record and the aircraft.
To ask about a trip, call +1 (862) 485-3510 or request a quote.
Sources
- eCFR, 14 CFR 135.385, 135.387, 135.398, 135.4, 1.1 and 91.1037, text as of November 1, 2026, accessed November 19, 2026.
- Embraer, Phenom 300E brochure, accessed November 19, 2026.
- Cessna, Citation Latitude, accessed November 19, 2026.
- FAA airport data via AirNav: KMVY, KACK, KTEB and KASE, accessed November 19, 2026.
How much runway the rules require for one landing distance
The same jet, the same 2,212-foot brochure landing distance, under four sets of rules.
| Landing must fit within | Runway needed for a 2,212 ft landing | Who it applies to | |
|---|---|---|---|
| Part 135 charter, dry | 60% of effective runway length (135.385(b)) | About 3,687 ft | Large and small transport category turbine airplanes; commuter category airplanes |
| Part 135 charter, runway may be wet | 115% of the dry requirement (135.385(d)) | About 4,240 ft | Turbojets under the same sections, unless the flight manual has an approved wet distance |
| Eligible on-demand operator | 80% of effective runway length (135.385(f)) | About 2,765 ft | Operators meeting 135.4, with a Destination Airport Analysis and operations specifications |
| Fractional program flight | 60%, or 80% with a Destination Airport Analysis; 115% if wet (91.1037) | About 3,687 ft dry | Part 91 subpart K fractional programs |
| Private owner, Part 91 | No percentage margin in the sections we read | The flight manual distance | Owner-flown and corporate flights not under Part 135 or subpart K |
More questions people ask
Does a private jet need more runway to take off or to land?
On the brochure, takeoff usually needs more: Embraer lists 3,209 feet to take off at maximum weight and 2,212 feet to land for the Phenom 300E. Once the 60 percent rule in 14 CFR 135.385 is applied to the landing, the landing becomes the larger figure, about 3,687 feet on our arithmetic.
What is the effective length of a runway?
It is the part of the runway the rule lets the crew count. 14 CFR 135.385(b) measures the landing from a point 50 feet above where the obstruction clearance plane meets the runway, so trees, buildings or terrain off the end can make the usable length shorter than the painted length.
Do the same rules apply to the alternate airport?
Yes. 14 CFR 135.387(a) applies the same 60 percent test to an alternate airport for turbojets, and 70 percent for turboprops. An operator approved under 135.387(b) may use 80 percent at an alternate.
Does a heavier load need a longer runway?
Yes. 14 CFR 135.385(a) bars a takeoff at a weight that would leave the aircraft above the landing weight in its flight manual for the destination's elevation and the expected temperature. More passengers, bags or fuel raise the landing weight and the distance it needs.
Why did my quote name a different airport from the one I asked for?
Often because of the runway. If the aircraft's landing distance, factored by the charter rules for the expected weather, does not fit the runway you asked for, the operator has to choose a longer runway nearby or a different aircraft. Ask which rule decided it.
Sources
- eCFR: 14 CFR 135.385, Landing limitations: destination airports (accessed November 19, 2026)
- eCFR: 14 CFR 135.387, Landing limitations: alternate airports (accessed November 19, 2026)
- eCFR: 14 CFR 135.397 and 135.398, small transport and commuter category performance limitations (accessed November 19, 2026)
- eCFR: 14 CFR 135.4, Applicability of rules for eligible on-demand operations (accessed November 19, 2026)
- eCFR: 14 CFR 1.1, General definitions (large aircraft) (accessed November 19, 2026)
- eCFR: 14 CFR 91.1037, fractional ownership landing limitations (accessed November 19, 2026)
- Embraer: Phenom 300E brochure (accessed November 19, 2026)
- Cessna: Citation Latitude (accessed November 19, 2026)
- AirNav: KMVY, KACK, KTEB and KASE (FAA airport data) (accessed November 19, 2026)
Related articles
- Van Nuys Airport (VNY) rules for private jets
Airports and operations
- Morristown Airport (MMU) rules for private jets
Airports and operations
- Hanscom Field (BED) rules for private jets
Airports and operations
Route guides
Flight times, prices and airport detail for trips where this applies.
- Teterboro to Martha's Vineyard
Islands and coast
- Teterboro to Nantucket
Islands and coast
- Teterboro to Aspen
Mountains

Written by Jake Lombardi
Jake is the managing director of Lombardi Jet Services. He has spent 15 years in private aviation and has arranged more than 1,000 charters. He holds a CPA license, volunteers with Backpacks for Life and collects art and memorabilia. About Jake
Plan this trip with Jake
Tell Jake your dates and how many are travelling, and he will come back with options and one clear price.
Request a quoteCall Jake: +1 (862) 485-3510
Lombardi Jet Services is an air charter broker. It is not a direct air carrier and does not have operational control of any aircraft. Flights are provided by properly licensed direct air carriers (FAA Part 135 operators, or foreign equivalents), which keep operational control. We act as our clients' agent.